NEW Mother of all Canucks Abroad (and domestic) In Men's National Teams Posted January 23, 2018 On 1/22/2018 at 7:49 AM, Unnamed Trialist said: It cost 6 million euros, seats 6000, took about 30 months to build. More images of the interior: https://templosdelfutbol.com/2017/09/23/nuevo-malecon-torrelavega/ This looks like a mix between Deus Ex or Blade Runner stuff and a smaller scale Swissporarena. Looks great.
NEW Mother of all Canucks Abroad (and domestic)
In Men's National Teams
Posted
This looks like a mix between Deus Ex or Blade Runner stuff and a smaller scale Swissporarena. Looks great.